Mattias
09-29-2000, 10:17 AM
Hi !
My OWA shows the wrong week, it shows the correct week number + one, that is week 40 instead of 39. My ordinary Outlook2000 shows the correct week number 39.
Im running Exchange 5.5 sp3 and IE 5.01.
Can I configure this at server level ?
Anyone ????
TIA / Mattias
My OWA shows the wrong week, it shows the correct week number + one, that is week 40 instead of 39. My ordinary Outlook2000 shows the correct week number 39.
Im running Exchange 5.5 sp3 and IE 5.01.
Can I configure this at server level ?
Anyone ????
TIA / Mattias